INSPECTION OF CROSS-COUNTRY PIPELINES....
DETAILS OF PIPELINE JOBS UNDER BAXCOUNSEL
INSPECTION (as on 31/12/2002)

NAME OF THE CLIENT
NAME OF THE PROJECT
DETAILS OF PIPELINE
YEAR OF EXECUTION
ANY OTHER INFORMATION
(A) MAHA NAGAR GAS LTD. (MDPE &PE)

Inspection & Quality surveillance for MDPE

Length : 273kms approx
Size : 1/2”to 7”
2000-01
2002-03
 
Inspection & quality surveillance for Carbon Steel Length: 22km approx
Size : 4”/6” / 12”NB
2000-01
2002-03
 
(B)  GAS AUTHORITY OF INDIA (GAIL) (CARBON STEEL) (CATHODIC PROTECTION OF PIPELINE ALSO UNDER  BAXCOUNSEL SCOPE) Kota-Rajasthan: Chambal Fertilizer to Samcor Length: 40kms
Size: 12”NB
1995-96
 
Rajahmundry: Mandapeta to K.Cheruvu Length: 21 kms.
Size : 8”NB
1995-96
 
Rajahmundry: Pipeline construction from S.Yanum to Gudala Length: 9.5kms
Size : 8”NB
1995-96
 
Rajahmundry: SV-6 Thimapuram to Spectrum Power Plant Length: 7kms
Size: 12”NB
1996-97
 
Jaiselmar-Rajasthan : RSEB to ONGC Length : 4.5kms
Size : 8”NB
1995-96
 
Nagapattinam: ONGC Gas collection station at Buvanagiri to Sumangala Steels. Length : 3kms
Size : 4”NB
1995-96
 
Nagapattinam: SPIC Fine Chemicals to EID Parry, Karaikal Length : 3kms
Size: 4”NB
1995-96
 
Baroda : Dabka to HNPL(Chitral) Length : 6kms
Size: 4”NB
1995-96
 
Nadiad :G.E.Apar Length: 13kms
Size: 4”NB
1995-96
 
GACL, Dahej Length : 11 kms.
Size: 6”NB
1996-97
 
Gujarat Borosil Ltd., Ankleshwar Length : 13kms
Size : 4”NB
1995-96
 
Ahmedabad: Vadu-EPS to Pioneer IDL Length :1.5kms
Size : 4”NB
1995-96
 
Sadanand CGS to Jalaram Ind.Ahmedabad Length : 1.2kms
Size : 4”NB
1995-96
 
Sobhasan CGS to Ashok, Ramesh and Standard Industries, Ahmedabad

Length : 3 kms
Size : 4"NB

1995-96
 
Ahmedabad: Motera CGS to RIL

Length : 3.5kms
Size : 4"NB

1995-96
 
Bharuch : Gujarat Torrent Energy Corpn.

Length : 4.6kms

Size : 18"NB

1997-98
 
Baroda : Mahi River Crossing, Dabka. Length: 1.5kms
1996-97
 
Baroda : Madhusudan Ceramics & Gujarat Glass Length: 5 kms
Size : 4"NB
1996-97
 
Baroda : Horizontal directional drilling Mahi River Crossing

Length: 1.5kms
Size : 12"NB

1997-98
 
Ahmedabad: Wasna EPS to Sterling Chemicals & Prabhat Pottery.

Length: 3.9kms
Size: 4"NB

1997-98
 
Ahmedabad: ONGC to Bhavani Chemcials & Ajit SIL-Chem.

Length : 2.5kms
Size : 4"NB

1997-98
 
Ahmedabad: Nandasan EPS to anik Tiles

Length : 2.5kms
Size : 4"NB

1996-97
 
Ahmedabad: Sobhasan CTF to Vimal Oil

Length : 3.8kms
Size: 4"NB

1996-97
 
Vimal Oil to Mahalaxmi Ceramics & Gujarat Multi Gas Ltd.

Length : 1.7kms
Size: 4"NB

1996-97
 
NTPL-Jhanore to GNFC Bharuch

Length: 16kms
Size: 12" NB

1993-94
 
CUSTODY TRANSFER Metering Terminal Piping at ONGC, Trombay (including valves, filters, instrumentation, civil & structural works)

Length :  -
Size: 18"/16"NB

1996-97
 
CONSTRUCTION OF STEEL PIPELINE FOR CITYGAS DISTRIBUTION.

Length : 2.104kms
Size : 12"NB"

Length: 0.765Kms
Size : 4"NB

1997-98
 
Bell Ceramics Gas Pipeline at Palej, Dist.Bharuch

Length: 7.5kms
Size : 3" dia

1998
 
Belgium Glass Pipeline, Baroda
Quality Surveillance & Insp.

Length : 3.5kms
Size : 4" dia

1999
 
Hazira Loop Line – Quality Surveillance

Length: 1.2kms
Size: 30" dia

1999
 
GCS Kalol to GMS Kadi Length : 19.370kms
Size : 8"
1999
 
NKCTF to GMS Kadi

Length : 16.280kms
Size : 8"

1999
 
Shobhasan CTF-Dudhsagar

Length : 15.400kms
Size : 8"

1999
 
Vemar (HBJ)  to NTPC – Jhanore
(Bharuch). Pipeline & Terminal piping.(Quality Surveillance)

Length : 25 Kms
Size : 14" NB

2000
 
IPCL  Terminal to GIPCL - Baroda. (Pipeline & Terminal Piping)
Quality Surveillance
Cauvery Basin, Nagapattinam :( surveillance for terminal piping) 

Length : 5 Kms
Size : 8" NB

2000
 

Nallur to TMK

Length : 10 Kms
Size : 12"NB
2000
 
Sumangala Steel to Neycer Length : 16 Kms
Size :4"NB
2000
 
Kamalapuram TNCSE

Length : 5 Kms
Size : 3"NB

2000
 
Tatipaka to Narsapur

Length : 27kms
Size : 14"NB

2000
 

K.G.Basin – Rajamundry :
Kakinada-NFCL

Length : 19.5 Kms
Size : 18"NB

2000
 
Narsapur-Kovuur

Length : 63 Kms
Size : 12"NB

2000
 
Kesavapalli-Bodasakuru Length : 13 Kms
Size : 8"NB
2000
 
Vatsasr Power Project. Length : 2 Kms.
Size : 4"NB
2000
 
Mori-Dindi Length : 9 Kms.
Size : 12"NB
2000
 
Lanco Pipeline Project
Tatipaka-Kondapali. (Surveillance)
Size : 18" Dia.
Length: 205kms
2001
 
Jhanore-Gandhar Pipeline Project
(Surveillance)
Length: 38kms
Size : 12"NB
2001
 
GSFC Permanent Gas Receiving
Terminal - Baroda.
(Quality Surveillance) 
Terminal.
(Civil & Mechanical)
2001
 
ONGC-GGS to Gujarat Gas Ltd.,
Kosamba. (Surveillance)
Length : 3.0 Kms.
Size : 6" Dia.
2001
 
Delhi(DESU)-Bahadurgarh Length: 27kms
Size : 8"dia
2001-02
 
Agra-Ferozabad (Surveillance) Length : 22 kms
Size : 8" NB
2002
 
S.Yanam to Gudala
K.G. Basin. (Surveillance)
Length : 10 Kms
Size : 16" Dia.
2001
 
BSES Pipeline project.
Kakinada. (Surveillance)
Length : 7.7 Kms.
Size : 18" Dia
2001
 
Ponnamanda to Kadali
(K.G. Basin) - Surveillance
Length : 3.7 Kms.
Size : 14" Dia.
2001-02
 
Tatipaka to Vainateyam
(K.G. Basin) - Surveillance
Length : 7.1 Kms.
Size : 18" Dia
2001-02
 
Muktheswaram SV3 to
Mumbmidivaram. K.G. Basin.
Surveillance
Length : 3.8 Kms.
Size : 4" Dia.
2001-02
 
Haryana Sheet Glass - Ankleshwar. Length : 15.9 Kms
Size : 4" Dia
2002
 
Pipeline Health checking at
Ahmedabad / Baroda / Bharuch Region.
Length : Approx. 500 Kms.
Size : Various sizes
2001-02
 
Kotapalli to SV5.(K.G. Basin) - Surveillance Length : 10.4 Kms.
Size : 18" Dia
2002
 
Tatipaka - K. Cheruyu Section-II.(K.G. Basin) - Surveillance. Length : 23.67 Kms.
Size : 18" Dia.
2002
 
HDD Across river Gowtami and Vainetyam.(K.G. Basin) - Surveillance. Size : 18" Dia.
Length: 1.78 kms
2002
 
Pasarlapudi to Mukteswaram.(K.G. Basin) - Surveillance Length: 23.6 kms
Size : 18" Dia
2002
 
Odaru to endemuru.(K.G. Basin) - Surveillance Length : 5.3 Kms.
Size : 8" Dia
2002
 
Kesanapalli (W) to Ponamanda.(K.G. Basin) - Surveillance Length : 4.0 Kms.
Size : 12" Dia.
2002
 
Kuthlam-PPN (Nagapattinam)Surveillance Length : 33 kms
Size : 18"NB
2002
 
Visakhapatnam - Secunderabad LPG Pipeline. (Quality Surveillance) Length : 600 Kms
Size : 10"/12" Dia
2002
 
Kandla - Samakhili LPG Pipeline (Quality Surveillance) Length : 70 Kms.
Size : 12" & 8" Dia
2002
GAILTotal 2133.769
Kalol-Ramol Pipeline Project L- 48 kms.
dia 12"6"
2003
 
(C) IGL (INDRAPRAS-THA GAS LTD )NEW DELHI (PE) Delhi City Gas DistributionProject for CNG Length: 50 kms
Size : 12"/8"/6"/4"NB

97 - 02
2003

Under process
(D)DODSAL/IPCL, DAHEJ (CARBON STEEL) DGB PIL (Three parallel PIL Dahej IPCL to Baroda IPCL for Ethlene, Naphatha & Propylene. Length: 3 x 105 kms
= 315 Kms.
Size: 6" / 4"
1996-97
 
(E)HINDUSTAN PETROLEUM CORPN.LTD. (CARBON STEEL) Re-Routing of MPPL (Mumbai-Pune Pipeline) inside BARC Length : 2.1 kms
Size : 14"NB
1998
 
14" dia OD MPPL and Hookup with the existing pipeline of MPPL. Length : 2 km approx
Size : 14" NB
1999
 
12"dia Lube Oil Pipeline at MOD Link Road Length : 750 mtrs.
Size : 12" NB
2001
 
(F) INDIAN OIL CORPN.LTD (CARBONSTEEL) Kandla-Bhatinda Pipeline Project (BAX represented Skoda Exports, Czech Republic for QA/QC activities ) Length: 1443km approx.
Size : 14"NB to 22"NB
1994-95
 
(G) NIKO RESOURCES LTD., HAZIRA (CARBONSTEEL) Inspection of 12" dia 4.5km pipeline underground in sea bed and 4" dia 1.2km pipeline above ground. Length : 4.5kms in sea bed.
Size : 12"NB
Length : 1.2km aboveground
Size: 4"NB
2000
 
(H) GUJARAT GAS CO. LTD. SURAT. Amboli - Jhagadia Search-chemPipeline Project., Ankleshwar. Length : 22.3 Kms
Size : 10" Dia.
2002
 
Spur line from TOP 1&2 - NTPC,Hazira. Length : 2.6 Kms.
Size : 12" Dia.
2002
 
(I) GUJARATSTATE PETRONET LTD. Cairn - Mora Interconnector P/LProject - Hazira Length : 6.4 Kms.
Size : 24" Dia x 16mm.
2002
 
Mora - Kribhco (Hazira). Length : 2.6 Kms.
Size : 12" Dia.
2002
 
Mora - NTPC. (Hazira) Length : 1.0 Kms.
Size : 12" Dia.
2002
 
(J)RCF- RASHTRIYA CHEMICALS LTD. Affluent Pipeline-Subsea for RCF,Thal Length: 4.5kms
Size : 24"NB
1983
 
Inplant, Fire/Water underground pipeline for RCF Trombay V Length: 4kms
Size: 6"/ 10"NB
1979-80
 
(K) NOCIL Inplant- Naphtha Pipeline Length : 1.5kms
Size : 8"NB
1977
 
(L) CHAROTAR GAS SAHAKARI MANDALI LTD., ANAND. Horizontal Boring (Pushing Method) under railway trackFrom Vallabh Vidhyanagar & Karamsad.Location - 5-6/7km point Length : 50 mtrs
Size : 6"
2001
 
(M)AEGIS LOGISTICS LTD., TROMBAY Low temperature carbon steel and SS Piping from new pir pau jetty to Aegis Terminal Length : 4km SS. 4km C
SSize: 300 NB
2001
 
Inplant - carbon steel piping (LSHS) and carbon steel steam piping. Length : 1km
Size : 300mm and 50mm
2001
 
(N)BHARAT DYNAMICS LTD., HYDERABAD Inplant - High Pressure Stainless Steel Pipeline - erection, fabrication, testing and commissioning at DRDO Assy. Shops. Length: Approx.2km
Size: 40"NB / 15"NB
1994
 
(O) GUJARAT STATE FERT.LTD., BARODA Fresh water Hume pipeline from Mahisagar River French well to GSFC, Fertilizer Plant, Baroda. Length : 26kms
Size : 36" dia
1978/79
 
 
TOTAL PIPELINES INSPECTED BY BAXCOUNSEL : 3,482.719 KMS

NOTE :

BAXCOUNSEL team of Pipeline inspection  engineers are highly experienced  in conducting Quality control and assurance of   cross country pipeline, and related  mechanical equipment/items of pipeline projects.

It shall also interest you to note that BAXCOUNSEL were involved in QA/QC activities of Kandla-Bhatinda Pipeline project right from the beginning till completion including inspection at compressor stations. Although EIL were the main consultants, QA/QC activities were rendered by BAXCOUNSEL on behalf of Skoda, Czech, who were the consortium leader for the project.

The associated activities like Inspection of Line Pipes at Manufacturers’ Plants, Cathodic Protection during laying of pipelines and PE coating was also stage wise inspected by BAXCOUNSEL at coating yards.  